A single source of information
Architectural, structural, services and production drawings need one current, dated and accountable decision flow to prevent clashes on site.
Reduce uncertainty with mock-ups
Full-scale samples of critical facade, bathroom, furniture or metal details test tolerances, assembly, shadow gaps and maintenance access.
Production planning belongs to design
Drawing approval, samples, orders and installation dates for every trade must be planned with the design programme.
Handover is not a final-day inspection
Checklists begin with production; critical work is verified before it is covered, and final review transfers maintenance and use knowledge to the client.
