01

Site and use scenario

Choosing a building system begins with the physical conditions of the site and the way the building will be used—not with a catalogue model.

02

Insulation and climate

Wall, roof and window decisions should be assessed through long-term energy performance as well as initial investment cost.

03

Production and assembly

The factory-production scope, on-site works and delivery criteria should be clearly defined before the contract is signed.